News from Germany and the world RSS Calm mode: off
DE EN
deublitz.de
Latest
Economy

Prabowo, get rid of the biggest EV battery factory

President Prabowo Subianto will be scheduled to inaugurate the operation of an EV battery factory in Cardyes in the near future.

Prabowo, get rid of the biggest EV battery factory

Jakarta, CNBC Indonesia - President Prabowo Subianto's plans will be scheduled to inaugurate the battery factory of an electric vehicle (EV) in Carbular, West Java, in the near future.

It was revealed to be Minister of Heilarization Field and Transition of Power Ladahlia at the State Palace, Monday (19 / 10 / 2026).

"Well, for the issue of hilirization in the nickel sector it went well. Yesterday the President declared several factories in Westabay in Maluku North. And soon we're going to be doing an inaugural ecosystem battery factory in Caredary that one year ago the President was groundbreaking. It was a partnership between CATL and our BUMN," reveal Bahlil.

As for the EV battery factory is managed by the Global Contemporary Amperex Technology Battery (CATlB), a joint company between Indonesia Battery Corporation (IBL) and CBL, China's largest battery manufacturer son, Contemporary Amperex Technology Co. Limited (CATL).

Indonesia Battery Corporation has revealed that the power-vehicle battery plant at the PTC Contemporary Amperex Technology Battery (CTUB) has been operating since July 2026.

The PT CATABs are a joint company between IBC and CBL, the son of China's largest battery manufacturer, Contemporary Amperex Technology Co.

The IBC director Aditya Farhan Arif said, the production facility in Cartoons produces battery electrical vehicles, as well as energy storage systems.

"It's been like this now, so it's been operating since July.

Aditya revealed that the factory had a capacity planned for expansion until it reached at least 15 Giga Watt hours. Right now the first stage has already been built at 6.9 gwh capacity.

Total investment for battery factory development to the capacity of 15 GWh is estimated to reach about US $1.2 billion equivalent Rp 21.19 trillion.

As a matter of fact, the capacity of 15 GWh is the equivalent of being able to power about 250,000 electrical vehicles.

The construction of a factory that was in Artha Industry Hill (ALH) & The New Industry City (NICC) Carbular, West Java began on June 29, 2025. The Prabowo inaugurated the laying of the first stone or groundbreaking at the time.

With the factory operating this July 2026, it means the construction of "just" took about 13 months.

This is the second battery factory of electric vehicles after the factory belonging to PT Hyundai LG Indonesia (HlI) Green Power in Cardacy operates and was declared in July 2024.

The CATABs integrated battery factory in the Clairvoyant was built in an area that covers a cell factory of 1 km and a packing facility next to it. In the process of producing it, the input of battery material was processed into cell forms before the packer's development.

"The input from this factory is battery material, then it's supposed to be formed into a cell, then it's done packing in its packaging facility,

In terms of operational factories, the IBC has run a science transfer program by sending 600 employees to train in China.

In addition, as a commitment to environmental aspects, the IBC plans to install the Solar Power Generator (PLTS) is a capacity of 18 MW Peak in 2027.

In addition to the Caredary project, the IBC along with CATL also developed a battery material project in Halmahera with US $600 million investment value or Rp 10.59 trillion.

Source: CNBC Indonesia ›

Comments (0)

No comments yet.

Comments are reviewed before they are published.
108 percent of the Annual Target
Economy

108 percent of the Annual Target

Central Java's bulog records are up to 406.253 tons of rice equivalent until October 2026, or 108.43% of the annual targets.

Detik Positive